M4SYS Logo
Project Overview

Ganghwa-gun Sinmun-ri Public Housing Modular Project

The Ganghwa-gun Sinmun-ri Public Housing project is a prime example of public rental housing built quickly and to a high standard of completion by introducing M4SYS's cutting-edge DfMA (modular) method for local residential stability. To overcome the geographical limitations of outskirt areas where securing on-site construction manpower and materials is relatively difficult, we adopted a method in which over 80% of the entire process was precisely pre-fabricated in our smart factory, then transported and assembled on-site.

By drastically reducing the construction period compared to conventional wet methods, we realized swift residential stability for local residents. Furthermore, excellent insulation and floor noise blocking designs were applied as standard for the comfortable living of residents. It is a successful public architectural model that gained favorable responses from neighbors through an eco-friendly process that minimized on-site waste generation.

Key Project Achievements

  • Rapid Housing Supply: Achieved completion in the shortest time possible by conducting factory module production and on-site foundation civil works simultaneously.
  • Minimized Local Complaints: Perfectly prevented inconvenience to nearby residents by reducing site residency time, noise, and dust generation.
  • High-quality Residential Environment: Maximized thermal and sound insulation performance by applying modules that passed strict factory quality control (QC).
  • Eco-friendly Public Architecture: ESG construction that radically reduced on-site construction waste and lowered carbon emissions.
  • Safe Working Environment: Fundamentally blocked serious accidents by transferring high-risk altitude work to the indoor factory process.

Project Type

Public Housing (Modular Construction)

Client

POSCO A&C

Scope of Work

Exterior Roofing and Systems Construction

Project Date

2023