M4SYS Logo
Project Overview

Sejong Sanul-dong Happy Housing Modular Project

Located in Sanul-dong, Sejong City, the Happy Housing project is an innovative public residential complex development applying M4SYS's cutting-edge modular (DfMA) construction method. By pre-fabricating (Off-site Construction) over 80% of the entire process in the factory and bringing it to the site for assembly, we drastically shortened the construction period compared to conventional wet methods while maximizing the uniformity of construction quality.

In particular, we realized an eco-friendly construction that fundamentally blocked civil complaints from local residents by minimizing construction waste, noise, and dust generated on-site. The standardized, high-quality modular units provide residents with excellent thermal and sound insulation performance, setting a new standard for sustainable future residential architecture in this successful project.

Key Project Achievements

  • Reduced Construction Time: Approx. 40% reduction in construction period compared to conventional methods by applying the DfMA method.
  • Quality Improvement: Achieved zero defect rate through automated smart factory production.
  • Eco-friendly Construction: Drastic reduction in on-site waste and carbon emissions.
  • Residential Performance: Providing a comfortable environment through the integration of high-performance vacuum insulation panels and soundproofing materials.
  • Safety Management: Perfect prevention of on-site safety accidents by minimizing high-altitude work.

Project Type

Public Rental Housing (Modular Construction)

Client

POSCO A&C

Scope of Work

Exterior and Roof System Construction

Project Date

2024